Aliağa-Çandarlı-Bergama New Railway Infrastructure Construction and Çandarlı Port Railway Connection Infrastructure Construction Work

Aliağa-Çandarlı-Bergama New Railway Infrastructure Construction and Çandarlı Port Railway Connection Infrastructure Construction Work

2017 ng Turkish State Railways Administration / 84607 JCC halaga limitasyon ng bilang 357.632.114,26 TL, na gastos tungkol 503.413.178,30 per Aliaga-Çandarlı Bergama Bagong Railway Construction Infrastructure at Çandarlı Port Rail Link Infrastructure Construction Business malambot 26 kumpanya singles at luto at malambot upang ibigay ang 359.058.110,36 bawat bid IC ICTAS CONSTRUCTION SAN. VE TİC. Inc. + ASTUR CONSTRUCTION AND TRADE. Inc. + KALYON CONSTRUCTION INDUSTRY. VE TİC. Inc. joint venture. Ang kumpanya ng 4, na sumali sa malambot, ay nagsumite ng bid sa ibaba ng halaga ng limitasyon.

Sinasakop ng malambot ang mga gawaing imprastraktura ng 49,3 railway sa pagitan ng Aliağa - Çandarlı - Bergama at humigit-kumulang na koneksyon 7,3 km Çandarlı Port Railway. Ang tagal ng trabaho ay 730 (pitong daan at tatlumpung) araw ng kalendaryo mula sa lugar ng paghahatid.

1 Komento

  1. Higit pang mga pagbabayad pagbabayad na ginawa kapag ito ay ginawa

Mag-iwan ng tugon

Ang iyong email address ay hindi nai-publish.


*